When working on energy storage projects, do you also have these questions about noise reduction products?
"Does the acoustic enclosure work well? Will it affect heat dissipation of the equipment?"
"For outdoor installation, can it withstand wind, rain and exposure?"
"Is the installation cycle long? Will it delay the project schedule?"
As a specialized and sophisticated enterprise serving more than 200 energy storage noise reduction projects worldwide, NCC has summarized the top 3 FAQs from customers and answered them in plain language, helping you avoid misunderstandings and detours!

Answer:
Fully compliant, with no impact on ventilation and heat dissipation! NCC QUIET series acoustic enclosures adopt a resistive‑reactance composite acoustic structure, integrating more than 25 patented technologies. The measured noise reduction can reach 25–35 dB(A).The products are triple‑certified by EU CE, US AMCA and UK BSRIA, and can easily control the noise of energy storage power stations below 65 dB(A), fully complying with environmental acceptance standards in the EU, North America, Australia and Southeast Asia.

Meanwhile, we have optimized the aerodynamic flow design. The interior of the soundproof enclosure is equipped with ample reserved ventilation channels, featuring low wind resistance that does not affect the normal heat dissipation of fans and liquid-cooled units.This truly achieves "silent operation without airflow blockage", eliminating any concerns about equipment overheating.
Up to standard protection, high durability, suitable for long‑term outdoor operation! Raw materials for energy storage noise reduction products are from international brands and high‑temperature resistant materials, ensuring fireproof, rainproof, sound insulation, dust‑proof and filtration performance. The dustproof grade reaches IP55, effectively protecting against rain, dust and corrosion. The overall corrosion resistance reaches C5H level, and can adapt to extreme climates from -30°C to 60°C, standing up to wind, sun, rain and weathering.

Under normal use: Service life of acoustic enclosures: more than 15 years Service life of acoustic louvers: more than 10 years No frequent maintenance is required, greatly reducing later operation costs.
Question 3: Is the product installation complicated? Is the period long? Will it delay the project progress?
Answer: Modular design, standard configuration, convenient installation, and short period! All muffler products of NCC Boheng adopt prefabricated modular production, which is produced and debugged in the factory in advance. Only on-site splicing and assembly are needed, without complicated construction processes. The installation of a single set of acoustic enclosure only takes 2-3 days, and the installation of acoustic louvers can be carried out simultaneously. The installation period of noise reduction products for a set of energy storage power stations is usually controlled within 10 days, which will not delay the overall commissioning progress of the project; at the same time, we will arrange a professional installation team for guidance to ensure standardized and efficient installation.